Towers

 
150 Foot collapsed
 
Cleaning up
 
 

Cleaning up after the storm.

Material

It is clear what will happen to the mast at PA1A once everything has been tidied up. Removing all the debris is the first priority for now
.

     
  Aluminium

20m boom and VHF vertical
     
  14MHz boom

Cutting the 3" boom
     
  Grease

Easy to remobe the sections
     
  Hardline 7/8"

Removing 600ft coaxial hardline from the collapsed rotating tower.
     
  Thickness

Steel thickness from one of the rods seems 100%.
     
 

Trailer

Pile of 7/8"

Guywires are all 100%

     
  Brackets

1" bracket bend like chewing gum.

Using a grinder to cut the sections
     
  Boom clamps

After the collapse, these calmps are flattened.

Remote direction readout.
     
 

Wires

One leg of the 40m dipole is broken

Bended debris from HF antennas

     
 

Left

10x tower sections are 100%

Piled load for as scarp!

     
             
  -->NEXT PAGE-->